PCSV Inspection

Perform PCSV Actuation Test 

  1. Connect KDS/GDS to Data Link Connector (DLC).
  2. Ignition "ON" & Engine "OFF"
  3. Perform "Actuation Test"  for "Canister Purge Valve".
    Fig 1: Screen Display - PCSV Actuation Test
    G12149974Courtesy of KIA MOTORS AMERICA, INC.
  4. Does the PCSV operate properly? (Check variation)

    YES 

    NO 

    • Go to next procedure.

Inspect PCSV 

  1. Ignition "OFF".
  2. Disconnect PCSV connector.
  3. Measure resistance between power and control terminal of the PCSV. (Component Side)

    Specification:  Approx. 22.0 to 26.0 [20°C (68°F)]

Confirm Part Inspection 

  1. Does the PCSV operate properly? (Check variation)

    YES 

    NO 

    • Carefully re-do this troubleshooting guide steps.