FixVault

[Feedback Position Sensor]

  1. Connect the KDS/GDS to the data link connector.
  2. Fully open and fully close the EEGR valve by conducting the actuation test.
  3. Check that the voltage is within the specification
    EEGR VALVE VOLTAGE SPECIFICATION

    Item Specification
    Sensor Power (V) 5
    Pin 3
    Closed Voltage (V) 3.85 - 4.15
    Open Voltage (V) 0.75 - 1.25