FixVault

Repair Procedures: Inspection

  1. The relay on the horn of this vehicle is built into the metal core block PCB of the engine room relay block.

    Information 

    The relay inserted on PCB as a semiconductor chip cannot be replaced. If replacement of relay is required, replace and test the metal core box.