FixVault

Repair Procedures: Inspection

  1. Connect the GDS to the Data Link Connector (DLC).
  2. Measure the output voltage of the RPS at idle and various engine speed.
    Fig 1: Rail Pressure Sensor Output Voltage Graph
    G12274646Courtesy of KIA MOTORS AMERICA, INC.