FixVault

Repair Procedures: Installation

  1. Connect the AVN monitor connectors.
  2. Install the AVN monitor.
  3. Install the center fascia upper panel.
  4. Connect the negative (-) battery terminal.
    NOTE:
    • Make sure that the cables and connectors are plugged in properly.
    • Check the AVN system.