Operating Test
WARNING: This page is about a different variant/trim than selected.
This test should be performed in the PTC ON conditions.
- Run the engine.
- Check the current on the wiring with a clamp multi tester.
| Pattern |
Current (A) |
| PTC 1 ON |
0.1 - 33 |
| PTC 2 ON |
0.1 - 33 |
| Total |
Max 100 |
- If the current is not within specification, inspect the related wiring.