FixVault

Repair Procedures: Installation

  1. Install the console floor switch complete.
  2. Install the connector from the console floor switch complete.
  3. Connect the connectors from the console upper complete.
  4. Install the console upper complete.
  5. Connect the negative (-) battery terminal.
NOTE:
  • Make sure that the connectors are plugged in properly.
  • Check the AVM system for normal operation.