FixVault

Open in CAN Communication Line Inspection

  1. Ignition "OFF"
  2. Disconnect Battery (-) terminal.
  3. Disconnect PCM and FPCM connectors.
  4. Measure resistance between Pin No. 77 (P-CAN High) terminal of PCM and Pin No. 3 (P-CAN High) terminal of FPCM.
  5. Measure resistance between Pin No. 60 (P-CAN Low) terminal of PCM and Pin No. 8 (P-CAN Low) terminal of FPCM.

    Specification:  Approx. below 1Ω

  6. Is measured value within specification?

    YES 

    NO