Repair Procedures: Installation
[LH]
- Install the STG spindle assembly.
Tightening torque:
6.9 ~ 10.8 N.m (0.7 ~ 1.1 kgf.m, 5.1 ~ 8.0 lb-ft)
- Connect the STG spindle connector.
- Install the tail gate pillar trim [LH].
- Connect the negative (-) battery terminal.
[RH]
- Install the STG spindle assembly.
Tightening torque:
6.9 ~ 10.8 N.m (0.7 ~ 1.1 kgf.m, 5.1 ~ 8.0 lb-ft)
- Connect the STG spindle connector.
- Install the rear A/C duct.
- Install the third row seat belt upper anchor.
Tightening torque:
39.2 ~ 53.9 N.m (4.0 ~ 5.5 kgf.m, 28.9 ~ 39.8 lb-ft)
- Install the luggage side trim [RH].
- Install the tail gate pillar trim [RH].
- Connect the negative (-) battery terminal.