FixVault

Repair Procedures: Installation

  1. Install in the reverse order of removal.
  2. Perform power liftgate mode change after replacing with a new power liftgate module.

    (Refer to Power Liftgate System - "TROUBLESHOOTING ")

  3. Perform the system initialization.

    (Refer to Power Liftgate System - "TROUBLESHOOTING ")

    NOTE: Before delivery to customer, operate the power liftgate to be sure that there is no warning sound.