Leveling Unit: Installation

  1. Coat the ball pin threads with "Loctite" grade CVX or suitable equivalent sealant. See Figure and Figure .
  2. NOTE: Do not fully tighten the fixings until all items are in their fitted position. See Figure and Figure .
  3. To complete installation, reverse removal procedure. Tighten all nuts and bolts to specification. See TORQUE SPECIFICATIONS  .