FixVault

Ride And Handling Optimization Switch: Installation

  1. Install the ride and handling optimization switch.
    • Install the 6 screws.
  2. Install the floor console upper panel. Refer to Floor Console Upper Panel article.
  3. Connect the battery ground cable. Refer to Specifications article.