FixVault

Inspect Power Main Relay Continuity

POWER MAIN RELAY CONTINUITY

Condition Tester connection Specified condition
Constant 1 - 2 Continuity
Apply B+ between terminals 1 and 2. 3 - 5 Continuity

If continuity is not as specified, replace the relay.