FixVault

Inspection Procedure

  1. Check pattern select switch. 

    PREPARATION: 

    Disconnect the pattern select switch connector.

    CHECK: 

    Check continuity between each terminal of pattern select switch connector when the select switch is set to PWR, NORM and SNOW positions

    Fig 1: Checking Continuity Between Each Terminal Of Pattern Select Switch Connector
    G01496676Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    OK: 

    Fig 2: Pattern Select Switch Continuity Chart
    G01496675Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. NG: Replace pattern select switch. 
    2. OK: Go to next step. 
  2. Check harness and connector between A/C control assembly and pattern select switch and body ground (See  HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE  . 
    1. NG: Repair or Replace the harness or connector. 
    2. OK: Proceed to next circuit inspection shown on problem symptoms table (See  PROBLEM SYMPTOMS   ).