FixVault

Height Control Accumulator: Installation

Installation is in the reverse order of removal (See  REMOVAL   ). 

AFTER INSTALLATION, FILL AHC PUMP MOTOR RESERVOIR WITH SUSPENSION FLUID AHC, BLEED AHC SYSTEM (See  ACTIVE HEIGHT CONTROL SYSTEM   ) AND CHECK FOR LEAKS (See  ON-VEHICLE INSPECTION   )