FixVault

Ventilation Valve Sub-ASSY: Replacement

  1. REMOVE V-BANK COVER 
  2. REMOVE VENTILATION VALVE SUB-ASS 
    1. Disconnect the ventilation hose from the valve.
    2. Remove the valve cover.
    3. Remove the valve.
  3. INSTALL VENTILATION VALVE SUB-ASSY 
    1. Apply adhesive to 2 or 3 threads of the valve.

      Adhesive: 

      Part No. 08833-00070, THREE BOND 1324 or equivalent 

      Fig 1: Applying Adhesive To Threads Of Valve
      G02957861Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the valve.

      Torque: 27 N.m (275 kgf.cm, 20 ft.lbf) 

      HINT:

      After applying the specified torque, rotate the valve clockwise with the port facing in the direction indicated in Fig 2.

    3. Install the valve cover.
    4. Connect the ventilation hose to the valve.
      Fig 2: Installing Valve
      G02957862Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. INSTALL V-BANK COVER