Charging (2GR-FSE): Generator: Installation
- INSTALL GENERATOR ASSEMBLY
- Install the generator with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Install the bracket with the bolt and nut.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Install the battery cable with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the bracket of the wire harness to the generator with the bolt.
- Attach the clamp of the wire harness to the generator.
- Connect the cable to the generator, and then attach the rubber cap.
- Install the generator with the 2 bolts.
- INSTALL COMPRESSOR ASSEMBLY
- Install the compressor with pulley for 2WD (see INSPECTION ) or 4WD (see INSPECTION ).
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
- Install the idler pulley and pulley cover plate with the bolt.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Install the idler pulley and pulley cover plate with the bolt.
- INSTALL V-RIBBED BELT (See INSTALLATION )
- INSTALL RADIATOR RESERVOIR ASSEMBLY (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR COOLANT LEAK (See COOLING SYSTEM )
- CHARGE REFRIGERANT (See REPLACEMENT )
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- WARM UP ENGINE (See REPLACEMENT )
- CHECK FOR LEAKAGE OF REFRIGERANT (See REPLACEMENT )
- INSTALL V-BANK COVER (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- INSTALL ENGINE UNDER COVER (for 4WD)
- INSTALL ENGINE UNDER COVER (for 2WD)
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).