Fuel Pressure Sensor: Installation

  1. INSTALL FUEL PRESSURE SENSOR 
    1. Install a new gasket to the fuel pressure sensor.
    2. Using SST, install the fuel pressure sensor to the No. 1 delivery pipe.

      SST 09922-10010 

      Torque: 24 N*m (240 kgf*cm, 18 ft.*lbf) for use with SST 

      31 N*m (316 kgf*cm, 23 ft.*lbf) for use without SST 

      HINT:

      • The torque for use with SST is the torque when SST is used at the position shown in the illustration.
      • Make sure SST and wrench are connected in a straight line.
      Fig 1: Identifying Fulcrum Length
      G05286989Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the connector with the clamp.
      Fig 2: Locating Connector With Clamp
      G05286990Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL NO. 1 FUEL PIPE (See  INSTALLATION  ) 
  3. CONNECT WATER HOSE JOINT (See  INSTALLATION  ) 
  4. INSTALL INTAKE MANIFOLD (See  INSTALLATION  ) 
  5. INSTALL INTAKE AIR SURGE TANK (See  INSTALLATION  ) 
  6. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY (See  INSPECTION  ) 
  7. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE (See  INSTALLATION  ) 
  8. CONNECT NO. 2 VENTILATION HOSE (See  INSTALLATION  ) 
  9. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY (See  INSTALLATION  ) 
  10. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See  INSTALLATION  ) 
  11. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See  INSTALLATION  ) 
  12. INSTALL FRONT FENDER TO COWL SIDE SEAL LH (See  INSTALLATION  ) 
  13. INSTALL FRONT FENDER TO COWL SIDE SEAL RH (See  INSTALLATION  ) 
  14. INSTALL FRONT PILLAR TO FRONT SIDE SEAL SUB-ASSEMBLY LH (See  INSTALLATION  ) 
  15. INSTALL FRONT PILLAR TO FRONT SIDE SEAL SUB-ASSEMBLY RH (See  INSTALLATION  ) 
  16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  17. ADD ENGINE COOLANT (See  REPLACEMENT  ) 
  18. INSPECT FOR COOLANT LEAK (See  COOLING SYSTEM  ) 
  19. INSPECT FOR FUEL LEAK (See  ON-VEHICLE INSPECTION  ) 
  20. INSTALL V-BANK COVER SUB-ASSEMBLY (See  INSTALLATION  ) 
  21. INSTALL ENGINE ROOM SIDE COVER LH (See  INSTALLATION  ) 
  22. INSTALL ENGINE ROOM SIDE COVER RH (See  INSTALLATION  ) 
  23. INSTALL COOL AIR INTAKE DUCT SEAL (See  INSTALLATION  ) 
  24. CHECK FUNCTION OF THROTTLE BODY WITH MOTOR ASSEMBLY (See  ON-VEHICLE INSPECTION  ) 
  25. PERFORM INITIALIZATION 
    1. Perform initialization (see INITIALIZATION ).
      NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable to the negative (-) battery terminal.