FixVault

Floor Shift Assembly: Installation

WARNING: This page is about a different car, the 2007 Lexus GS 430. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL FLOOR SHIFT ASSEMBLY 
    1. Install the floor shift assembly with the 4 bolts.

      Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf) 

    2. Connect the connector to the floor shift assembly.
    Fig 1: Locating Floor Shift Assembly Bolts
    G05288268Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY 
    1. Install the floor shift gear shifting rod sub-assembly with the nut.

      Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf) 

    Fig 2: Locating Floor Shift Gear Shifting Rod Nut
    G05295396Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  4. ADJUST SHIFT LEVER POSITION (See  ADJUSTMENT  ) 
  5. INSPECT SHIFT LEVER POSITION (See  ON-VEHICLE INSPECTION  ) 
  6. INSTALL FRONT FLOOR HEAT INSULATOR NO.1 (See  INSTALLATION  ) 
  7. INSTALL FRONT EXHAUST PIPE ASSEMBLY 

    (See INSTALLATION )

  8. INSTALL NO.2 CONSOLE BOX DUCT (See  INSTALLATION  ) 
  9. INSTALL CONSOLE BOX (See  INSTALLATION  ) 
  10. INSTALL CONSOLE BOX REGISTER ASSEMBLY (See  INSTALLATION  ) 
  11. REMOVE CONSOLE BOX PLATE (See  INSTALLATION  ) 
  12. INSTALL INSTRUMENT PANEL FINISH PANEL END LH (See  INSTALLATION  ) 
  13. INSTALL INSTRUMENT PANEL FINISH PANEL END RH (See  INSTALLATION  ) 
  14. INSTALL CONSOLE UPPER PANEL ASSEMBLY (See  INSTALLATION  ) 
  15. INSTALL FRONT CONSOLE UPPER PANEL GARNISH (See  INSTALLATION  ) 
  16. PERFORM INITIALIZATION 

    (See INITIALIZATION )