FixVault

Millimeter Wave Radar Sensor: Installation

  1. INSTALL MILLIMETER WAVE RADAR SENSOR ASSEMBLY 
    1. Install the sensor with the 3 bolts.

      Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf) 

    2. Connect the sensor connector.
      Fig 1: Locating Millimeter Wave Radar Sensor Assembly Bolts
      G05298677Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  3. ADJUST MILLIMETER WAVE RADAR SENSOR ASSEMBLY (See  ADJUSTMENT   ) 
  4. INSTALL FRONT BUMPER COVER  (See INSTALLATION )
  5. INSTALL FRONT FENDER LINER LH  (See INSTALLATION )
  6. INSTALL FRONT FENDER LINER RH  (See INSTALLATION )
  7. INSTALL ENGINE UNDER COVER  (See INSTALLATION )
  8. INSTALL COOL AIR INTAKE DUCT SEAL  (See INSTALLATION )
  9. PERFORM INITIALIZATION 
    1. Perform initialization (see INITIALIZATION (2006/02-2006/07) ).
      NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.