FixVault

Height Control Accumulator: Installation

Installation is in the reverse order of (REMOVAL  ).

HINT:

After installation, fill AHC pump motor reservoir with suspension fluid AHC, bleed the AHC system ( BLEEDING ) and check for leaks ( ON-VEHICLE INSPECTION  ).