FixVault

Floor Shift Assembly: Installation

  1. INSTALL FLOOR SHIFT ASSEMBLY 
    1. Install the floor shift assembly with the 4 bolts.

      Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf) 

    2. Connect the connector to the floor shift assembly.
      Fig 1: Locating Shift Lock Release Button Cover Bolts
      G05288268Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY 
    1. Install the floor shift gear shifting rod sub-assembly with the nut.

      Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf) 

  3. ADJUST SHIFT LEVER POSITION  (See ADJUSTMENT  )
  4. INSPECT SHIFT LEVER POSITION  (See ON-VEHICLE INSPECTION  )
    Fig 2: Locating Shifting Rod Sub-Assembly Nut
    G05294795Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  5. INSTALL FRONT FLOOR HEAT INSULATOR NO.1  (See INSTALLATION )
  6. INSTALL FRONT EXHAUST PIPE ASSEMBLY 

    (See INSTALLATION )

  7. INSTALL CONSOLE BOX DUCT NO.2  (See INSTALLATION )
  8. INSTALL CONSOLE BOX  (See INSTALLATION )
  9. INSTALL CONSOLE BOX REGISTER ASSEMBLY  (See INSTALLATION )
  10. INSTALL INSTRUMENT PANEL FINISH PANEL END LH  (See INSTALLATION )
  11. INSTALL INSTRUMENT PANEL FINISH PANEL END RH  (See INSTALLATION )
  12. REMOVE CONSOLE UPPER PANEL ASSEMBLY  (See INSTALLATION )
  13. INSTALL FRONT CONSOLE UPPER PANEL GARNISH  (See INSTALLATION )
  14. INSTALL ENGINE UNDER COVER NO.1 
  15. CONNECT BATTERY NEGATIVE TERMINAL 
  16. PERFORM INITIALIZATION 

    (See INITIALIZATION )