FixVault

Shift Lever: Installation

  1. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY 
    1. Install the floor shift with the 4 bolts.

      Torque: 8.3 N*m (85 kgf*cm, 74 in.*lbf) 

    2. Connect the 6 wire harness clamps to the floor shift.
    3. Connect the 2 connectors
      Fig 1: Locating Transmission Floor Shift Bolts With Connectors And Clamps
      G05781050Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY 
    1. Temporarily connect the shifting rod to the connecting rod swivel with the nut

      HINT.

      The nut will be tightened to a specified torque during the shift lever position adjustment procedure

      Fig 2: Locating Floor Shift Gear Shifting Rod Nut
      G05780942Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL NO. 1 CONSOLE BOX DUCT 
    1. Install the duct with the 2 screws
  4. INSTALL CONSOLE BOX ASSEMBLY  (See INSTALLATION )
  5. INSTALL LOWER CONSOLE COVER  (See INSTALLATION )
  6. INSTALL REAR CONSOLE END PANEL SUB-ASSEMBLY  (See INSTALLATION )
  7. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY  (See INSTALLATION )
  8. INSTALL REAR UPPER CONSOLE PANEL  (See INSTALLATION )
  9. INSTALL NO. 3 BOX PANEL  (See INSTALLATION )
  10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY  (See INSTALLATION )
  11. INSTALL INSTRUMENT PANEL FINISH PANEL END RH  (See INSTALLATION )
  12. INSTALL INSTRUMENT PANEL FINISH PANEL END LH  (See INSTALLATION )
  13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).
  14. ADJUST SHIFT LEVER POSITION  (See ADJUSTMENT  )
  15. INSPECT SHIFT LEVER POSITION  (See ADJUSTMENT  )
  16. INSTALL BATTERY SERVICE HOLE COVER LH  (See INSTALLATION )
  17. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY  (See INSTALLATION )