FixVault

Inspection Procedure

  1. PERFORM ACTIVE TEST USING TECHSTREAM (CRUISE MAIN INDICATOR LIGHT) 
    1. Using the Techstream, perform the Active Test.

      Combination Meter 

      ACTIVE TEST - COMBINATION METER

      Tester Display Test Part Control Range Diagnostic Note
      Indicate. Lamp Cruise CRUISE main indicator light operation OFF or ON -

      OK: Indicator light comes on/goes off. 

    NG: REPLACE COMBINATION METER ASSEMBLY  (See REMOVAL )

    OK: Go to next step 

  2. READ VALUE USING TECHSTREAM (CRUISE MAIN INDICATOR LIGHT) 
    1. Using the Techstream, read the Data List.

      Radar Cruise 

      DATA LIST - RADAR CRUISE

      Tester Display Measurement Item/Range Normal Condition Diagnostic Note
      CCS Indicator M-CPU CRUISE main indicator light (Main CPU) / ON or OFF ON: CRUISE main indicator light on
      OFF: CRUISE main indicator light off
      -

      OK: The Techstream display changes according to condition of CRUISE main indicator light. 

    NG: REPLACE ECM  (See ECM )

    OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE  (See PROBLEM SYMPTOMS TABLE  )