FixVault

Inspection Procedure

  1. INSPECT POSITION CONTROL ECU AND SWITCH ASSEMBLY (POWER SEAT CONTROL SWITCH AND ECU POWER SOURCE CIRCUIT) 
    1. Disconnect the position control ECU and switch assembly connectors.
    2. Measure the voltage according to the value(s) in the table below.

      Voltage 

      VOLTAGE SPECIFICATION

      Tester Connection Condition Specified Condition
      P33-5 (+B) - Body ground Always 10 to 14 V
      P32-4 (IG) - Body ground Ignition switch on 10 to 14 V
      P32-8 (SYSB) - Body ground Always 10 to 14 V
    3. Fig 1: Identifying P33 And P32 Connector
      G05281316Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    NG: REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER SOURCE CIRCUIT) 

    OK: Go to Next Step 

  2. INSPECT POSITION CONTROL ECU AND SWITCH ASSEMBLY (POWER SEAT CONTROL SWITCH AND ECU GROUND CIRCUIT) 
    1. Measure the resistance according to the value(s) in the table below.

      Resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Condition Specified Condition
      P33-1 (GND) - Body ground Always Below 1 Ω
    2. Fig 2: Identifying P33 Connector
      G05864291Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    NG: REPAIR OR REPLACE HARNESS OR CONNECTOR (GROUND CIRCUIT) 

    OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN  PROBLEM SYMPTOMS TABLE