Oil Cooler Assembly: Installation
- INSTALL WATER WITH MOTOR AND BRACKET PUMP ASSEMBLY
- Install the air duct with the 3 bolts.
Torque: 4.9 N*m (50 kgf*cm, 43 in.*lbf)
- Install the water with motor and bracket pump assembly with the bolt and nut.
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- Connect the connector, 2 water hoses and 2 oil cooler hoses to the water with motor and bracket pump assembly.
- Install the air duct with the 3 bolts.
- INSTALL FRAME SIDE RAIL PLATE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT BUMPER ASSEMBLY
(See INSTALLATION )
- ADD AND INSPECT HYBRID TRANSAXLE FLUID (See REPLACEMENT )
- ADD COOLANT (for Inverter) (See REPLACEMENT )
- INSPECT FOR COOLANT LEAK (for Inverter)
- INSTALL NO.1 ENGINE UNDER COVER (See INSTALLATION )
- INSTALL NO.2 ENGINE ROOM SIDE COVER LH (See INSTALLATION )