Charging (Service Information): Generator: Installation: Installation
- INSTALL GENERATOR ASSEMBLY
- Install the 2 generator brackets with the 2 bolts.
Torque: 20 N*m ( 204 kgf*cm, 15 ft.*lbf)
- Install the generator assembly with the 2 bolts.
Torque: 43 N*m ( 438 kgf*cm, 32 ft.*lbf)
- Install the bracket with the nut.
Torque: 20 N*m ( 204 kgf*cm, 15 ft.*lbf)
- Install the generator wire to terminal B with the nut (A).
Torque: 9.8 N*m ( 100 kgf*cm, 87 in.*lbf)
- Install the terminal cap.
- Install the clamp bracket with the bolt (B).
Torque: 10 N*m ( 102 kgf*cm, 7 ft.*lbf)
- Attach the 2 clamps, and connect the generator connector to the generator.
- Install the 2 generator brackets with the 2 bolts.
- INSTALL WIRE HARNESS
- Install the wire harness with the 3 nuts (A).
Torque: 10 N*m ( 102 kgf*cm, 7 ft.*lbf)
- Connect the 2 connectors (B).
- Install the wire harness with the 3 nuts (A).
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY . Refer to INSTALLATION - Step 2
- INSTALL NO. 2 ENGINE COVER . Refer to INSTALLATION - Step 28
- INSTALL RADIATOR INLET HOSE . Refer to INSTALLATION - Step 6
- INSTALL V-RIBBED BELT . Refer to INSTALLATION - Step 1
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL . Refer to INSTALLATION - Step 93
- ADD ENGINE COOLANT . Refer to ON-VEHICLE INSPECTION - Step 5
- CHECK FOR ENGINE COOLANT LEAKS . Refer to ON-VEHICLE INSPECTION - Step 1
- INSTALL NO. 1 INLET AIR CLEANER . Refer to INSTALLATION - Step 87
- INSTALL V-BANK COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 115
- INSTALL ENGINE ROOM SIDE COVER LH . Refer to INSTALLATION - Step 116
- INSTALL COOL AIR INTAKE DUCT SEAL . Refer to INSTALLATION - Step 118