FixVault

Transmission Control Switch: Installation: Installation

  1. INSTALL TRANSMISSION CONTROL SWITCH 
    1. Install the transmission control switch to the shift lever guide housing.
      Fig 1: Identifying Transmission Control Switch
      GTY106926Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      HINT: 

      Securely engage the claws.

    2. Apply MP grease to the shaded area of the shift lever guide housing as indicated in the illustration.
      Fig 2: Identifying MP Grease Applying Area
      GTY103198Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the shift lever guide housing with the shift lever lock pin and a new shift lever nut.
      Fig 3: Identifying Shift Lever Nut And Lock Pin
      GTY103681Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      NOTE:
      • Install the shift lever nut and lock pin after first engaging the 2 claws.
      • Securely engage the claws.
    4. Connect the transmission control switch connector to the floor shift assembly.
      Fig 4: Locating Shift Lock Control ECU Connector
      GTY107278Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY  See step  1
  3. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY  See step  2
  4. INSTALL FRONT FLOOR NO. 1 HEAT INSULATOR  . Refer to INSTALLATION - Step 4
  5. INSTALL FRONT FLOOR COVER CENTER RH 
    1. Install the front floor cover center RH with the 3 grommets.
      Fig 5: Locating Front Floor Cover Center Grommets
      GTY107259Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

  6. INSTALL FRONT EXHAUST PIPE ASSEMBLY  . Refer to INSTALLATION - Step 4
  7. INSTALL REAR FLOOR NO. 1 PANEL BRACE  . Refer to INSTALLATION - Step 7
  8. INSTALL FRONT FLOOR BRACE CENTER  . Refer to INSTALLATION - Step 6
  9. INSTALL HEATED OXYGEN SENSOR 
    1. Install the heated oxygen sensor. Refer to INSTALLATION .
  10. INSTALL NO. 2 CONSOLE BOX DUCT  . Refer to INSTALLATION - Step 11
  11. INSTALL CONSOLE BOX ASSEMBLY  . Refer to INSTALLATION - Step 18
  12. INSTALL CONSOLE BOX REGISTER ASSEMBLY  . Refer to INSTALLATION - Step 19
  13. INSTALL CONSOLE BOX PLATE  . Refer to INSTALLATION - Step 20
  14. INSTALL INSTRUMENT PANEL FINISH PANEL END LH  . Refer to INSTALLATION - Step 21
  15. INSTALL INSTRUMENT PANEL FINISH PANEL END RH  . Refer to INSTALLATION - Step 22
  16. INSTALL UPPER CONSOLE PANEL ASSEMBLY  . Refer to INSTALLATION - Step 23
  17. INSTALL FRONT CONSOLE UPPER PANEL GARNISH  . Refer to INSTALLATION - Step 24
  18. INSTALL SHIFT LEVER KNOB  See step  17
  19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  20. INSTALL BATTERY SERVICE HOLE COVER LH  . Refer to INSTALLATION - Step 35
  21. INSTALL LUGGAGE COMPARTMENT FLOOR MAT 
  22. INSPECT SHIFT LEVER POSITION  See step  1
  23. ADJUST SHIFT LEVER POSITION  See step  2
  24. INSPECT SHIFT LEVER OPERATION  See step  3
  25. CHECK FOR EXHAUST GAS LEAKS  . Refer to INSTALLATION - Step 8
  26. PERFORM INITIALIZATION 
    1. Perform initialization. Refer to INITIALIZATION .
      NOTE:

      Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.