FixVault

Installation (08/2011 - ): Installation

  1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY (CRAWL SWITCH) 
    1. Install the integration control and panel to the position indicator housing with the 5 screws.
      Fig 1: Locating Integration Control And Panel Screws
      GTY108908Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the connector.
  2. INSTALL LOWER POSITION INDICATOR HOUSING  . Refer to REASSEMBLY - Step 8
  3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY  . Refer to INSTALLATION - Step 5
  4. INSTALL CONSOLE CUP HOLDER BOX SUB-ASSEMBLY  . Refer to INSTALLATION - Step 6
  5. INSTALL PARKING BRAKE HOLE COVER  . Refer to INSTALLATION - Step 7
  6. INSTALL LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY  . Refer to INSTALLATION - Step 8
  7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY  . Refer to INSTALLATION - Step 9
  8. INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER RH  . Refer to INSTALLATION - Step 10
  9. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY RH  . Refer to INSTALLATION - Step 11
  10. INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER LH  . Refer to INSTALLATION - Step 12
  11. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH  . Refer to INSTALLATION - Step 13
  12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION .