FixVault

Power Switch: Installation: Installation

  1. INSTALL POWER SWITCH 
    1. Engage the 2 claws to install the power switch.
  2. INSTALL METER HOOD SUB-ASSEMBLY  . Refer to INSTALLATION - Step 30
  3. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION .

  4. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE  . Refer to INSTALLATION - Step 70
  5. INSTALL DECK FLOOR BOX RH  . Refer to INSTALLATION - Step 71
  6. INSTALL REAR NO. 3 FLOOR BOARD  . Refer to INSTALLATION - Step 72
  7. INSTALL REAR DECK FLOOR BOX  . Refer to INSTALLATION - Step 73
  8. INSTALL REAR NO. 2 FLOOR BOARD  . Refer to INSTALLATION - Step 74