FixVault

Installation [09/2015 - ]: Procedure

  1. INSTALL TCM 
    1. Install the TCM to the cowl side junction block RH with the 2 nuts.

      Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf) 

      NOTE:

      If the TCM has been struck or dropped, replace it.

  2. INSTALL COWL SIDE JUNCTION BLOCK RH 

    (Refer to INSTALLATION [09/2015 - ] )