FixVault

Installation [08/2021 - ]: Procedure

  1. INSTALL CENTER CLUSTER MODULE SWITCH LH (DOWNHILL ASSIST CONTROL SWITCH) 
    1. Attach the claw and install the center cluster module switch LH (downhill assist control switch) to the integration control and panel assembly.
  2. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY 

    Refer to INSTALLATION [08/2021 - ]

  3. PERFORM DOWNHILL ASSIST CONTROL CALIBRATION 
    1. Perform downhill assist control calibration (Refer to CALIBRATION [08/2021 - ] ).