FixVault

Installation [08/2021 - ]: Procedure

  1. INSTALL CENTER CLUSTER MODULE SWITCH LH (ABSORBER CONTROL SWITCH) 
    1. Attach the claw and install the center cluster module switch LH (absorber control switch) to the integration control and panel assembly.
  2. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY 

    Refer to INSTALLATION [08/2021 - ]