FixVault

Installation [08/2021 - ]: Procedure

  1. INSTALL CENTER CLUSTER MODULE SWITCH RH (HEIGHT CONTROL SWITCH) 
    1. Attach the claw and install the center cluster module switch RH (height control switch) to the integration control and panel assembly.
  2. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY 

    Refer to INSTALLATION [08/2021 - ]

  3. INSPECT SUSPENSION CONTROL SYSTEM 
    1. Inspect the suspension control system (Refer to TEST MODE PROCEDURE [08/2021 - ] ).