Installation [05/2023 - ]: Procedure
- INSTALL SKID CONTROL ECU ASSEMBLY
- INSTALL MAIN BODY ECU
Refer to INSTALLATION [05/2023 - ]
- PERFORM INITIALIZATION AND CALIBRATION OF LINEAR SOLENOID VALVE
Refer to INITIALIZATION [01/2017 - ]
- PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION
Refer to CALIBRATION [05/2023 - ]
- PERFORM TEST MODE INSPECTION
Refer to TEST MODE PROCEDURE [05/2023 - ]
- CHECK AND CLEAR DTC
Refer to DTC CHECK / CLEAR [09/2018 - ]
- INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.