Installation [01/2017 - 05/2023]: Procedure
- INSTALL SUB-BATTERY BRACKET
- Install the sub-battery bracket (positive (+) terminal side) to the sub-battery module assembly with the 2 bolts.
Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf)
- Install the sub-battery bracket (negative (-) terminal side) to the sub-battery module assembly with the 2 bolts.
Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf)
- Install the sub-battery bracket (positive (+) terminal side) to the sub-battery module assembly with the 2 bolts.
- INSTALL SUB-BATTERY MODULE ASSEMBLY
- Install the sub-battery module assembly with the 2 bolts and 2 nuts.
Torque: 6.8 N*m (69 kgf*cm, 60 in.*lbf)
- Connect the 2 sub-battery terminals to the sub-battery module assembly with the 2 nuts.
Torque: 8.7 N*m (89 kgf*cm, 77 in.*lbf)
- Install the sub-battery module assembly with the 2 bolts and 2 nuts.
- INSTALL CONNECTOR COVER
- Attach the 2 claws and install connector cover to the sub-battery module assembly.
- INSTALL NO. 2 DECK BOARD BRACKET
Refer to PROCEDURE - Step 4
- INSTALL INNER LUGGAGE COMPARTMENT TRIM COVER RH
Refer to PROCEDURE - Step 5 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 5 [01/2021 - 05/2023]
- INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER
Refer to PROCEDURE - Step 6 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 6 [01/2021 - 05/2023]
- INSTALL NO. 1 LUGGAGE COMPARTMENT LIGHT ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL LUGGAGE COMPARTMENT TRIM BOX
Refer to PROCEDURE - Step 8 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 8 [01/2021 - 05/2023]
- INSTALL REAR FLOOR FINISH PLATE
Refer to PROCEDURE - Step 9 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 9 [01/2021 - 05/2023]
- INSTALL SIDE TRIM BOX
Refer to PROCEDURE - Step 10 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 10 [01/2021 - 05/2023]
- INSTALL LUGGAGE COMPARTMENT TRIM COVER LH
Refer to PROCEDURE - Step 11 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 11 [01/2021 - 05/2023]
- INSTALL LUGGAGE COMPARTMENT TRIM COVER RH
Refer to PROCEDURE - Step 12 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 12 [01/2021 - 05/2023]
- INSTALL NO. 1 DECK BOARD
Refer to PROCEDURE - Step 14 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 14 [01/2021 - 05/2023]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL NO. 2 DECK BOARD
Refer to PROCEDURE - Step 13 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 13 [01/2021 - 05/2023]