FixVault

Installation [01/2017 - 05/2023]: Procedure

  1. INSTALL SUB-BATTERY BRACKET 
    1. Install the sub-battery bracket (positive (+) terminal side) to the sub-battery module assembly with the 2 bolts.

      Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf) 

    2. Install the sub-battery bracket (negative (-) terminal side) to the sub-battery module assembly with the 2 bolts.

      Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf) 

  2. INSTALL SUB-BATTERY MODULE ASSEMBLY 
    1. Install the sub-battery module assembly with the 2 bolts and 2 nuts.

      Torque: 6.8 N*m (69 kgf*cm, 60 in.*lbf) 

    2. Connect the 2 sub-battery terminals to the sub-battery module assembly with the 2 nuts.

      Torque: 8.7 N*m (89 kgf*cm, 77 in.*lbf) 

  3. INSTALL CONNECTOR COVER 
    1. Attach the 2 claws and install connector cover to the sub-battery module assembly.
  4. INSTALL NO. 2 DECK BOARD BRACKET 

    Refer to PROCEDURE - Step 4

  5. INSTALL INNER LUGGAGE COMPARTMENT TRIM COVER RH 

    Refer to PROCEDURE - Step 5 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 5 [01/2021 - 05/2023]

  6. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER 

    Refer to PROCEDURE - Step 6 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 6 [01/2021 - 05/2023]

  7. INSTALL NO. 1 LUGGAGE COMPARTMENT LIGHT ASSEMBLY 

    Refer to PROCEDURE - Step 1

  8. INSTALL LUGGAGE COMPARTMENT TRIM BOX 

    Refer to PROCEDURE - Step 8 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 8 [01/2021 - 05/2023]

  9. INSTALL REAR FLOOR FINISH PLATE 

    Refer to PROCEDURE - Step 9 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 9 [01/2021 - 05/2023]

  10. INSTALL SIDE TRIM BOX 

    Refer to PROCEDURE - Step 10 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 10 [01/2021 - 05/2023]

  11. INSTALL LUGGAGE COMPARTMENT TRIM COVER LH 

    Refer to PROCEDURE - Step 11 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 11 [01/2021 - 05/2023]

  12. INSTALL LUGGAGE COMPARTMENT TRIM COVER RH 

    Refer to PROCEDURE - Step 12 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 12 [01/2021 - 05/2023]

  13. INSTALL NO. 1 DECK BOARD 

    Refer to PROCEDURE - Step 14 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 14 [01/2021 - 05/2023]

  14. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 

    Refer to PROCEDURE - Step 2

  15. INSTALL NO. 2 DECK BOARD 

    Refer to PROCEDURE - Step 13 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 13 [01/2021 - 05/2023]