Installation [12/2017 - ]: Procedure
- INSTALL SPARK PLUG
HINT:
Perform "Inspection After Repair" after replacing an ignition coil assembly and spark plug.
Refer to INITIALIZATION [12/2017 - 10/2020] , or refer to INITIALIZATION [10/2020 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]
- Install the 6 spark plugs to the cylinder head sub-assembly.
Torque: 20 N.m (204 kgf/cm, 15 ft.lbf)
NOTE:If a spark plug has been struck or dropped, replace it.
- Install the 6 spark plugs to the cylinder head sub-assembly.
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 189 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 189 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 190 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 189 [10/2023 - ]
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 190 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 190 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 191 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 190 [10/2023 - ]
- INSTALL RADIATOR COVER PLATE
Refer to PROCEDURE - Step 191 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 191 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 192 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 191 [10/2023 - ]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 192 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 192 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 193 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 192 [10/2023 - ]