FixVault

Installation [12/2017 - ]: Procedure

  1. INSTALL SPARK PLUG 

    HINT: 

    Perform "Inspection After Repair" after replacing an ignition coil assembly and spark plug.

    Refer to INITIALIZATION [12/2017 - 10/2020] , or refer to INITIALIZATION [10/2020 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]

    1. Install the 6 spark plugs to the cylinder head sub-assembly.

      Torque: 20 N.m (204 kgf/cm, 15 ft.lbf) 

      NOTE:

      If a spark plug has been struck or dropped, replace it.

  2. INSTALL IGNITION COIL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  3. INSTALL LOWER RADIATOR AIR DEFLECTOR 

    Refer to PROCEDURE - Step 189 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 189 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 190 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 189 [10/2023 - ]

  4. INSTALL UPPER RADIATOR SUPPORT SEAL 

    Refer to PROCEDURE - Step 190 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 190 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 191 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 190 [10/2023 - ]

  5. INSTALL RADIATOR COVER PLATE 

    Refer to PROCEDURE - Step 191 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 191 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 192 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 191 [10/2023 - ]

  6. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 192 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 192 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 193 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 192 [10/2023 - ]