FixVault

Installation [10/2014 - ]: Procedure

  1. INSTALL ENGINE SWITCH 
    1. Attach the 2 claws to install the engine switch.
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 14 [10/2014 - 09/2017] , or refer to PROCEDURE - Step 13 [09/2017 - 05/2019] , or refer to PROCEDURE - Step 13 [05/2019 - ]