FixVault

Removal [09/2014 - ]: Procedure

  1. REMOVE INTAKE AIR SURGE TANK ASSEMBLY 

    Refer to REMOVAL [09/2014 - ]

  2. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 8

  3. REMOVE PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) 
    1. Slide the clip and disconnect the ventilation hose from the PCV valve (ventilation valve sub-assembly).
      GTY499951Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Remove the PCV valve (ventilation valve sub-assembly) from the case separator.
      GTY499952Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002