FixVault

Main Fan/Additional Fan Motor Operation Inspection: Notes

  1. Connect WDS or equivalent to DLC-2.
  2. Warm-up the engine.
  3. Access ECT PID.
  4. Measure voltage fan control module connector terminal B at 2-pin connector with monitoring ECT PID.