FixVault

Load Compensation Inspection

  1. Warm up the engine to normal operating temperature and idle it.
  2. Connect the WDS or equivalent to DLC-2.
  3. Select the following PID.
    • RPM
  4. Turn the electrical loads on and verify that the engine speed is within the specification. See ENGINE TUNE-UP .
    • If not as specified, carry out following:
      • Headlight Switch Inspection
      • A/C Switch Inspection
      • P/S Pressure Switch Inspection
      • IAC Valve Inspection
      • Fan Switch Inspection
      • Cooling Fan Motor Inspection
      • Rear Window Defroster Inspection