Battery - Load Test
WARNING: This page is about a different car, the 2005 Mazda Tribute. However, it is still accessible from the selected car via links, so may be relevant.
- With the engine running, turn the A/C on, the blower motor on high speed and the headlamps on high beam.
- Increase the engine speed to approximately 2,000 rpm. The voltage should increase a minimum of 0.5 volt above the base voltage.
- If the voltage does not increase as specified, carry out the Generator On-Vehicle Tests.
- If the voltage increases as specified, the charging system is operating normally.