Variable Air Duct (VAD) Control System Operation Inspection: Notes

  1. Connect WDS or equivalent to DLC-2.
  2. Access ECT, TP_REL and RPM PIDs.
  3. Start the engine.
  4. Verify ECT PID is 70°C {158°F} or over. 
  5. Inspect shutter valve operation under the following conditions.