FixVault

Battery - Load Test

  1. With the engine running, turn the A/C on, the blower motor on high speed and the headlamps on high beam.
  2. Increase the engine speed to approximately 2,000 rpm. The voltage should increase a minimum of 0.5 volt above the base voltage.
    1. If the voltage does not increase as specified, carry out the Generator On-Vehicle Tests.
    2. If the voltage increases as specified, the charging system is operating normally.