FixVault

Continuity Inspection

  1. Verify that the continuity between SSV switch terminals A and B is as indicated in MEASUREMENT CONDITION AND CONTINUITY CHART .
MEASUREMENT CONDITION AND CONTINUITY CHART

Measurement condition Continuity
Push the rod. No continuity
Except above Continuity detected