FixVault

Inspection Method for Sensor Connectors or Wiring Harnesses

  1. Connect the M-MDS to the DLC-2.
  2. Turn the ignition switch to the ON position (Engine off).
    NOTE:
    • If the engine starts and runs, perform the following steps during idle.
  3. Access PIDs for the switch you are inspecting.
  4. Slightly shake each connector or wiring harness vertically and horizontally while monitoring the PID.
    • If PID value is unstable, inspect for poor connection.
      Fig 1: Inspecting Switch Connectors/Wiring Harnesses
      G06150022Courtesy of MAZDA MOTORS CORP.