FixVault

Battery Tray Installation Note

  1. Set the battery tray to the installation position.
  2. Tighten the battery tray installation bolts in the order shown in the figure.
    Fig 1: Battery Tray Installation Bolts Tightening Sequence
    G10946995Courtesy of MAZDA MOTORS CORP.

    Tightening torque 

    • 22-30 N.m {2.3-3.0 kgf.m, 17-22 ft.lbf}
  3. Install the rubber at the two locations on the air cleaner component to the battery tray.
    Fig 2: Identifying Air Cleaner Rubber And Battery Tray
    G10946996Courtesy of MAZDA MOTORS CORP.