FixVault

Primary Shaft Component Assembly: Notes

WARNING: This page is about a different variant/trim than selected.
  1. Assemble the primary shaft component using the procedure shown in the figure.
    Fig 1: Identifying Primary Shaft Component Assembling Order
    G08347857