FixVault
Home
›
Mazda
›
2021
›
CX-9 Signature
›
Repair and Diagnosis
›
Electrical
›
Charging Systems
›
Charging System
›
Battery Removal/Installation
›
Battery Tray Installation Note
Battery Tray Installation Note
Set the battery tray to the installation position.
Tighten the battery tray installation bolts in the order shown in the figure.
Fig 1: Battery Tray Bolts Tightening Sequence
Courtesy of MAZDA MOTORS CORP.
Tightening torque
22-30 N.m {2.3-3.0 kgf.m, 17-22 ft.lbf}
Install the rubber at the two locations on the air cleaner component to the battery tray.
Courtesy of MAZDA MOTORS CORP.