FixVault

Function Inspection: Notes

  1. Connect the M-MDS to the DLC-2.
  2. Switch the main power ON (READY off).
  3. Display the PID [MAF]. (Refer to PID/DATA MONITOR INSPECTION in the appropriate troubleshooting information )
  4. Compare the voltage and flow rate indications for the PID [MAF] with the standard in the table indicated below.